PEAK HERITAGE

MOSELEY ROAD BATHS.

Moseley Road Baths

Peak Heritage were brought in as a sub-contractor on this project to provide a combination of restoration/repair and replacement of the Cast Iron water management system. The main façade sore extensive repairs, cleaning and general restoration of the ornate Lead hoppers and Cast-Iron downpipes with replacements to the lower sections, finished with a heritage colour scheme decoration traced back through the building’s history. 

The Cast Iron gutters and downpipes to the rear were found to be beyond repair and through discussion with the design team we found the best solution for the building to be to replace the existing with new Cast Aluminium to closely match the profile of the original system.

Peak Heritage craftsmen worked alongside our colleagues at Peak Safety to complete concrete repairs to most of the window surround details while works replacing flat roofs and rooflights continued to ensure all works were completed to coincide with the school holidays.

Moseley Road Baths Example 2
Working on Moseley Road Baths
Moseley Road Baths Example 1

ALL PROJECTS

SURVEYING

CONSTRUCTION

WORKING AT HEIGHT

BESPOKE

SAFETY MANAGEMENT